Preventive Maintenance for Fire System – CO2 Total Flooding System

Work Progress Update :

Maintenance work for Fire System – CO2 Total Flooding System.

  • – Checking all the Smoke & Heat Detector
  • – Checking the Fire Panel.
  • – Checking the CO2 Discharge functioning.
  • – Replace Fire Panel Backup Battery 12V 7.2Ah
  • – Collect Fire Extinguisher for Renew Bomba Certification.
April 6, 2018

Leave a Reply

Your email address will not be published. Required fields are marked *